Second largest load in history hits Alberta highways

adminadmin is verified member.

Administrator
Staff member
Jan 20, 2008
15,871
452
83
20 15 10 2 20 10 5 1
EDMONTON, Alta. – Mammoet Canada is at it again, moving historically large loads on Alberta’s highway system. This time, the carrier will be transporting a polypropylene reactor from Cessco Fabrication in Edmonton to Inter Pipeline’s Heartland Petrochemical complex in Strathcona…

Continue reading...