Overpass and Infrastructure Strikes in Metro Vancouver

AgentSmith

Well-Known Member
Jan 16, 2019
518
767
93
Vancouver, BC
30
But the 3pl told us it was 200 x 80 x 120.... except that was the CARGO height, not the FR overall... story as old as time.
 
But the 3pl told us it was 200 x 80 x 120.... except that was the CARGO height, not the FR overall... story as old as time.
Brother lets get together and invent some kind of tool with like, numbers on it we could verify measurements with. We'd make a fortune.
(also it's 5pl at this point probably)
 
  • Haha
Reactions: Wiley One
Brother lets get together and invent some kind of tool with like, numbers on it we could verify measurements with. We'd make a fortune.
(also it's 5pl at this point probably)
The helicopter was supposed to fly OVER the overpass (hence the word over) .... and then land on the flatbed once we crossed .... have you not seen Mission Impropable
 
Brother lets get together and invent some kind of tool with like, numbers on it we could verify measurements with. We'd make a fortune.
(also it's 5pl at this point probably)
I have 1 of then things. If i remember right it Measures 9 M high. I have had it for about 25 yrs now.
 
Something seems odd to me. If you look at their website (assuming accurate but doesn't look full of istock photos), they list helicopter and oversized machinery movement. Even special helicopter trailers.
 
I had given this company (IMT) freight between 2009 - 2012 so I can't advise on current conditions but I had always received great service. They used their own equipment and hauled heavy and OD loads for me.