1
Hi all, so we've been having a dedicated carrier for loads but our production has increased for our product so we are in need of more carriers but with FSC I'm unsure of going rates as I've had decent responses but then some quoting 11k just for ON-BC. INSANE.
Anyone have suggestions as we're paying 6900 currently but there's room to increase as I want to pay carriers fairly for the service. With the 25-33% increase since January/feb to today, I'm thinking an additional 800 that's averaging between the 25-33%. Any insight would be great as I have the room to play a bit with the numbers.
Avg from quotes I'm sitting around 7500-7800 for ON-BC dry FTL (12000 lbs max). Need some insight. TIA
Anyone have suggestions as we're paying 6900 currently but there's room to increase as I want to pay carriers fairly for the service. With the 25-33% increase since January/feb to today, I'm thinking an additional 800 that's averaging between the 25-33%. Any insight would be great as I have the room to play a bit with the numbers.
Avg from quotes I'm sitting around 7500-7800 for ON-BC dry FTL (12000 lbs max). Need some insight. TIA
