We load out of Harrow weekly and usually in and out within the 3 hrs if not quicker , we use roll tite equipment so no extra time doing the tarping , I do know it had taken longer years ago but that has changed for sure, The only loads now that take a little longer then most when there is mixed sizes of tubing which requires more time to load properly.
DWC